Copper Sinking Process in PCB Production
04Dec
Summer 0條評論

Copper Sinking Process in PCB Production

Perhaps we may be surprised that the substrate of the pcb circuit board only has copper foil on both sides, while the middle is the insulating layer. So they do not need to be connected between two or more layers of circuits of the PCB circuit board? How can the circuits on both sides be connected together to make the current flow smoothly?


pcb


Now let's see the PCB circuit board manufacturer explain the magIC process - copper deposition (PTH).

Copper plating is the abbreviation of Eletcroless Plating Copper, also known as Plated Through hole, abbreviated as PTH, which is a self catalyzed redox reaction. The process of PTH shall be carried out after the drilling of two or more layers of boards is completed.

Function of PTH: chEMIcally deposit a thin layer of chemical copper on the drilLED non-conductive hole wall substrate as the base for subsequent copper electroplating.

Decomposition of PTH process: alkaline degreasing secondary or tertiary countercurrent rinsing roughening (micro etching) secondary countercurrent rinsing pre leaching activation secondary countercurrent rinsing degumming secondary countercurrent rinsing copper precipitation secondary countercurrent rinsing acid leaching

PTH detailed process explanation:

1. Alkaline degreasing: remove oil stains, fingerprints, oxides, and dust in the hole; The hole wall is adjusted from negative charge to positive charge, which is convenient for the adsorption of colloidal palladium in the subsequent process; Cleaning after oil removal shall be carried out in strict accordance with the requirements of the guidelines and shall be tested by copper sinking backlight test.

2. Micro etching: remove the oxide on the board surface, coarsen the board surface, and ensure a good adhesion between the subsequent copper deposition layer and the base copper; The newly formed copper surface has strong activity and can well adsorb colloidal palladium;

3. Pre leaching: It is mainly to protect the palladium tank from the pollution of pre-treatment tank liquid, and extend the service life of the palladium tank. The main components are consistent with those of the palladium tank except palladium chloride, which can effectively wet the hole wall, so that subsequent activation liquid can enter the hole in time for sufficient and effective activation;

4. Activation: after the adjustment of the polarity of alkaline oil removal by pretreatment, the positively charged pore wall can effectively absorb enough negatively charged colloidal palladium particles to ensure the average, continuity and compactness of subsequent copper deposition; Therefore, oil removal and activation are crucial to the quality of subsequent copper deposition. Key control points: specified time; Standard stannous ion and chloride ion concentration; The specific gravity, acidity and temperature are also very important, which should be strictly controlled according to the operation instructions.

5. Degumming: remove the stannous ions wrapped outside the colloidal palladium particles, expose the palladium core in the colloidal particles, and directly and effectively catalyze the chemical copper precipitation reaction. Experience shows that it is a better choice to use fluoroboric acid as the degumming agent.

6. Copper precipitation: the autocatalytic reaction of chemical copper precipitation is induced by the activation of palladium core. Both the new chemical copper and the reaction by-product hydrogen can be used as the reaction catalyst to catalyze the reaction, so that the copper precipitation reaction continues. After being treated by this step, a layer of chemical copper can be deposited on the plate surface or hole wall. During the process, the tank liquid shall be stirred with normal air to convert more soluble copper.

The quality of the copper sinking process is directly related to the quality of the production PCB circuit board. It is the main source process of blocked vias and poor open and short circuits, and it is not convenient for visual inspection. The subsequent process can only be probability screened through destructive experiments, and can not effectively analyze and monitor individual PCB boards. Therefore, once problems occur, they must be batch problems. Even if the test can not be completed, the final product will cause great potential quality problems, It can only be scrapped in batches, so it is necessary to strictly follow the parameters in the operation instructions.

點擊
然后
聯系
主站蜘蛛池模板: 亚洲精品国产欧美一二区| 亚洲另类自拍丝袜第五页 | 亚洲伊人五月丁香激情| 午夜内射高潮视频| 欧美日韩综合一区二区三区| 亚洲处破女av日韩精品| 欧美人妻体内射射| 国产新婚夫妇叫床声不断| 老熟妻内射精品一区| 精品+无码+在线观看| 日产日韩亚洲欧美综合| 亚洲精品久久久久中文字幕二区| 5x性社区免费视频播 | 无码区日韩特区永久免费系列| 日韩精品中文字幕无码一区| 曰本极品少妇videossexhd| 国产成人精品综合久久久久| 国产精品99久久久久久猫咪| 国产精品偷伦视频免费还看旳| 最新国产麻豆aⅴ精品无码 | 欧美亚洲综合另类色妞网| 亚洲成av人片不卡无码久久| 无码国产精品一区二区免费vr| 大屁股熟女白浆一区二区| 亚洲aⅴ在线无码播放毛片一线天 天天爽天天狠久久久综合麻豆 | 天天做天天爱夜夜夜爽毛片| 亚洲国产成人精品青青草原导航| 97se狠狠狠狠狼鲁亚洲综合色| 色悠久久久久久久综合网| 撕开奶罩揉吮奶头高潮av| 久久久久88色偷偷| 激情文学另类小说亚洲图片| 亚洲国产精品无码久久久秋霞2| 日韩精品无码免费毛片| 午夜免费啪视频| 亚洲乱码日产精品b| 国产放荡对白视频在线观看| 亚洲精品色情aⅴ色戒| 激情无码人妻又粗又大| 热re99久久精品国产66热 | 国产欧美在线一区二区三|