Welding peak temperature and solder paste melting point
29Oct
Andy 0條評論

Welding peak temperature and solder paste melting point

Welding peak temperature and solder paste melting point


In the daily patch processing, because of the partICularity of the customer's products or the different characteristics of the solder, the whole process of PCBA manufacturing is not a standard thing.

In the daily patch processing, because of the particularity of the customer's products or the different characteristics of the solder, the whole process of PCBA manufacturing is not a standard thing. In brief, in the process of reflow soldering, the reflow soldering temperature needs to be accurately adjusted because of different PCB substrates, different high and low temperature solders, and different product functional indicators. More often, the furnace temperature tester is also needed. Now let's learn about the time between the peak welding temperature and the melting point of the solder paste.

Requirements on peak welding temperature and melting point time of solder paste


PCBA



Welding peak temperature

Because the packaging structure and size of each component on the PCB are different, the temperature curve obtained by the test is not a curve, but a group of temperature curves. Therefore, the peak temperature of welding has the highest peak temperature and the lowest peak temperature. The design of welding peak temperature must first determine the process category, such as:

(1) Mixed loading process - BGA with lead solder welding SAC305 solder ball.

(2) Low temperature solder process - BGA of low temperature solder (such as Sn57 Bilag) welding SAC305 solder ball

(3) Conventional lead-free process - welding SAC305 with SAC305 solder.

(4) Low silver solder process -- low silver solder welding lead-free BGA

Secondly, the basic SMT chip processing and welding process requirements shall be met, that is, the peak temperature shall not be higher than the maximum thermal temperature of the components, nor lower than the minimum welding temperature.

Finally, it is suggested that the welding of BGA has its particularity, i.e., the phenomenon of once and twice collapse. Only after two collapses of BGA welding, can the standard drum shape solder joint morphology be formed and self centering be realized. The test shows that the peak welding temperature of BGA solder joint must be 11~12 ℃ higher than the melting point of solder paste and last for enough time to realize the secondary collapse. In actual production, the uneven interval between Kazhong and PCBA and the fluctuation of furnace temperature are often required to be higher than 15 ℃, which is to ensure that all BGAs meet this requirement. Otherwise, there may be solder joints where the solder ball is not completely fused with the solder, which is also the standard feature of mixed loading process using low temperature welding peak temperature and low temperature solder welding. If it is really necessary to weld at low temperature due to the heat resistance of components and parts, it is necessary to ensure that the BGA patch is centered, because automatic centering cannot be achieved when the solder ball and solder cannot be fused. This situation is also prone to special bridging due to alignment problems.

點擊
然后
聯(lián)系
主站蜘蛛池模板: 久久国产精品免费一区二区三区| 妺妺窝人体色www看美女| 中文字幕亚洲精品无码| 男人的天堂va在线无码| 综合一区无套内射中文字幕| 一本加勒比hezyo中文无码| 老子影院午夜伦手机不四虎卡| 2021国内精品久久久久精免费| 久久亚洲精品日韩高清| 狠狠躁夜夜躁av网站中文字幕| 99re8这里有精品热视频| 久久久久亚洲精品天堂| 欧美一区二区三区成人片在线 | 成熟了的熟妇毛茸茸| 真实国产乱啪福利露脸| 国产山东熟女48嗷嗷叫| 波多野42部无码喷潮在线| 日本精品人妻无码77777| 国产xxxx69真实实拍| 国产喷水1区2区3区咪咪爱av| 亚洲va中文字幕不卡无码| 欧美老妇bbbwwbbbww| 亚洲精品一区二区三区无码a片| 18禁免费无码无遮挡网站| 熟妇人妻系列av无码一区二区| 亚洲色精品vr一区区三区| 人妻熟女一区二区aⅴ向井蓝| 国内精品久久久久影院嫩草| 中文字幕有码无码人妻在线| 亚洲国产精品高清久久久| 欧美乱妇无乱码大黄a片 | 亚洲综合久久一本久道| 国产偷国产偷亚洲高清日韩| 欧美成aⅴ人高清怡红院| 久久精品日日躁夜夜躁| 欧美浓毛大泬视频| 久热在线这里只有精品国产 | 亚洲国产人成在线观看69网站| 久久大香香蕉国产免费网动漫| 人妻暴雨中被强制侵犯在线| 国产亚洲精aa在线观看see|