午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
PCB制造
PCB制造
Welding peak temperature and solder paste melting point
29Oct
Andy 0條評論

Welding peak temperature and solder paste melting point

Welding peak temperature and solder paste melting point


In the daily patch processing, because of the partICularity of the customer's products or the different characteristics of the solder, the whole process of PCBA manufacturing is not a standard thing.

In the daily patch processing, because of the particularity of the customer's products or the different characteristics of the solder, the whole process of PCBA manufacturing is not a standard thing. In brief, in the process of reflow soldering, the reflow soldering temperature needs to be accurately adjusted because of different PCB substrates, different high and low temperature solders, and different product functional indicators. More often, the furnace temperature tester is also needed. Now let's learn about the time between the peak welding temperature and the melting point of the solder paste.

Requirements on peak welding temperature and melting point time of solder paste


PCBA



Welding peak temperature

Because the packaging structure and size of each component on the PCB are different, the temperature curve obtained by the test is not a curve, but a group of temperature curves. Therefore, the peak temperature of welding has the highest peak temperature and the lowest peak temperature. The design of welding peak temperature must first determine the process category, such as:

(1) Mixed loading process - BGA with lead solder welding SAC305 solder ball.

(2) Low temperature solder process - BGA of low temperature solder (such as Sn57 Bilag) welding SAC305 solder ball

(3) Conventional lead-free process - welding SAC305 with SAC305 solder.

(4) Low silver solder process -- low silver solder welding lead-free BGA

Secondly, the basic SMT chip processing and welding process requirements shall be met, that is, the peak temperature shall not be higher than the maximum thermal temperature of the components, nor lower than the minimum welding temperature.

Finally, it is suggested that the welding of BGA has its particularity, i.e., the phenomenon of once and twice collapse. Only after two collapses of BGA welding, can the standard drum shape solder joint morphology be formed and self centering be realized. The test shows that the peak welding temperature of BGA solder joint must be 11~12 ℃ higher than the melting point of solder paste and last for enough time to realize the secondary collapse. In actual production, the uneven interval between Kazhong and PCBA and the fluctuation of furnace temperature are often required to be higher than 15 ℃, which is to ensure that all BGAs meet this requirement. Otherwise, there may be solder joints where the solder ball is not completely fused with the solder, which is also the standard feature of mixed loading process using low temperature welding peak temperature and low temperature solder welding. If it is really necessary to weld at low temperature due to the heat resistance of components and parts, it is necessary to ensure that the BGA patch is centered, because automatic centering cannot be achieved when the solder ball and solder cannot be fused. This situation is also prone to special bridging due to alignment problems.

點擊
然后
聯系
主站蜘蛛池模板: 亚洲乱码伦小说区| 青青青爽视频在线观看| 精品免费久久久国产一区| 国产在观线免费观看久久| 真实的国产乱xxxx在线| 午夜dj在线观看高清在线视频完整版| 无码加勒比一区二区三区四区| 日日干夜夜操高清视频| 国产免费看插插插视频| 久久久久久久久久久久中文字幕| 精品无码一区二区三区不卡| 夜夜高潮夜夜爽夜夜爱爱| 亚洲精品字幕| 婷婷四房综合激情五月在线| 麻豆网神马久久人鬼片| 国产色视频网免费| 欧美精品v欧洲高清视频在线观看 国产又色又爽又黄刺激在线视频 久久综合色天天久久综合图片 | 国产精品人成视频免费软件| 一二三四视频在线观看日本| 六月丁香婷婷色狠狠久久| 亚洲人成日韩中文字幕不卡 | 人人妻人人澡人人爽国产一区| 无码国产精品一区二区免费3p| 亚洲最大激情中文字幕| 国产亚洲精品久久久久久久久| 国产69精品久久久久久久| 天堂俺去俺来也www色官网| 国产免国产免费| 国产999精品2卡3卡4卡| 自拍亚洲综合在线精品| 亚洲精品综合一区二区三区在线| 久久久久久国产精品免费无码| 国产69精品久久久久999小说| 老色69久久九九精品高潮| 人妻少妇精品无码专区漫画| 成在人线av无码免观看| 国产成人亚洲综合无码dvd| 国产成人精品必看| 性无码一区二区三区在线观看| 欧美国产激情一区二区在线| 天天爽天天爽夜夜爽毛片|