Kingford SMT processing plant how to reduce proofing time?
29Nov
Caddy 0條評論

Kingford SMT processing plant how to reduce proofing time?

1、, Kingford  SMT processing plant how to reduce proofing time?

Want to reduce the time of the SMT proofing, we don't waste time on something else, before making a proofing work must be carefully to understand the needs of the customer, correct understanding from the perspective of several different aspects, this is our prEMIse and basis to reduce the time spent, no one in the process of doing this job, We must have a correct understanding of some of the situations, whICh is the premise for us to better complete the whole proofing work.

For any person, since we want to reduce the time of SMT patch proofing, we should also do some related plans in advance, so as to be more standardized, and effectively avoid many other problems in the process of doing, so that we can avoid some detours in the process of manufacturing.

So when doing the design scheme should be timely to do some standardization, such as the heat dissipation of the line hole, specific reservation, and some MARKed position, may just be the design of planning, must write the corresponding parameters, so that you can reduce the use of time.

Since SMT proofing of work to do, we should also do some appropriate planning of the work ahead of time, and can also have the correct understanding, to the number of specific number if the first plan is too large, it can lead to cost is higher, but also should try to do more out when doing the proofing.

Because this may bring us more protection, so no matter who is doing, we should actively consider these actual situations, because this point can bring us more role and significance, but also can guarantee the subsequent use of the situation.

SMT proofing


2、, the key equipment in SMT production

SMT SMT machine is a key and complex equipment in SMT production. smt mounter has been developed from the early low speed mechanical mounter to the high speed optical center mounter, and to the multi-function, flexible connection modular development.

A, classification,

1. According to the speed, it is divided into medium speed patch machine, high speed patch machine and super high speed patch machine.

2. According to the function, it is divided into: high speed/ultra-high speed mounter: mainly with the mounter component as the main body, there are not many varieties of the mounter device;

3. According to the degree of automation is divided into full automaton SMT machine: most of the SMT machine is this kind of machine.

4. According to the way of placement, it is divided into sequential placement machine: it is in accordance with the order of the components are attached to the PCB, usually seen is this kind of placement machine. SIMultaneous laminator: WITH a special hopper for placing cylindrical components, all components can be mounted on the corresponding pads of PCB in one action. When the product is replaced, all the materials are replaced completely, which is rarely used. Simultaneous on-line laminating machine: It is composed of a plurality of laminating pieces, which can mount a PCB at the same time in turn.

2、, precision SMT machine process

1. Place the circuit board with components on a tray perpendicular to the bottom of the CAMera.

2. Turn on the switch of the mounting machine

3. Lift up the circuit board with components and attach the original to the suction cup of the vacuum pen.

4. Place the printed PCB to be welded on a tray perpendicular to the bottom of the camera.

5. Adjust the high and low knobs of the vacuum suction pen to move it down until it is 1-2 cm away from the printed circuit board.

6. Open the display switch and observe on the display. Adjust the tray knob to make the IC chip pin completely coincide with the solder pad corresponding to the printed circuit board to be welded.

7. Place the IC chip on the vacuum nozzle vertically and gently onto the solder pad corresponding to the printed circuit board.

8. Because the suction nozzle has not been powered off, it is not possible to remove the suction nozzle immediately at this time. Turn off the switch to stop the suction nozzle from working, gently remove the vacuum suction nozzle in the vertical direction, and mount it.

點擊
然后
聯(lián)系
主站蜘蛛池模板: 久久女人天堂精品av影院麻| 国产麻豆天美果冻无码视频| 无码不卡中文字幕av| 免费观看又色又爽又黄的韩国| 大香伊蕉在人线免费视频| 久久久久久人妻精品一区二区三区 | 好大好猛好爽好深视频免费| 一本加勒比波多野结衣| 呦系列视频一区二区三区| 国产精品特级毛片一区二区三区| 亚洲日韩中文在线精品第一| 国产亚洲精品久久精品69| 天堂va蜜桃一区二区三区| 美女网站免费观看视频| 亚洲精品国产综合99久久一区 | 久久婷婷五月综合色高清| 国产亚洲精品久久一区二区| 丰满多毛的大隂户毛茸茸| 裸体美女网站| 成年女人免费v片| 欧美肉大捧一进一出免费视频| 制服肉丝袜亚洲中文字幕| 日韩欧国产精品一区综合无码 | 少妇高潮太爽了在线观看欧美| 少妇人妻中文字幕污| 青草久久久国产线免观| 人妻人人澡人人添人人爽| 午夜亚洲福利在线老司机| 成在线人免费视频| 潮喷失禁大喷水无码| 国产精品无码日韩欧| 午夜精品久久久久久久久| 欧美日韩在线亚洲综合国产人| 在线看片无码永久免费视频| 亚洲伊人久久大香线蕉综合图片| 装睡被陌生人摸出水好爽| 亚洲中文精品久久久久久不卡| 日本两人免费观看的视频| 色av综合av综合无码网站| 亚洲国产精品久久久久秋霞| 无码人妻精品一区二区|