午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”P(pán)CBA訂購(gòu)單需求。
PCBA方案設(shè)計(jì)
PCBA方案設(shè)計(jì)
PCB proofing and baking problems in SMT chip processing plant
29Nov
Jeff 0條評(píng)論

PCB proofing and baking problems in SMT chip processing plant

Circuit board proofing, whICh can be disassembLED and understood. PCB, that is, epoxy resin circuit board, proofing, that is, the production of product samples. Therefore, PCB proofing, that is, before the mass production of PCB circuit boards, is to confirm whether the circuit design and product production plan are feasible, and the number of samples commissioned by manufacturers is generally SMAll.

Charging

pcb board

Is there charge for circuit board proofing? There is no absolute answer to this. The MARKet strategy, sample difficulty, sample delivery date, cooperation time and other reasons of circuit board manufacturers will affect its results. However, judging from the current development trend of PCB boards, the majority of manufacturers charge for PCB proofing, for the following reasons:

First, cost. Cost is an important indicator that any enterprise must evaluate. In the rigid circuit board industry, no matter how many pieces of circuit boards are produced, manufacturers must invest a certain amount of cost, such as labor, materials, technology, water and electricity. The technical fees and production processes invested in producing 1pcs and 1Kpcs PCBs are equal. A large number of samples will bring a certain amount of cost pressure to manufacturers;

Secondly, market factors. In PCB industry, "good and bad are mixed", and there are also real demanders, but there are also countless middlemen (especially individuals) doing trade. In order to minimize costs, such traders often cheat manufacturers to make PCB samples, take the samples and sell them to other traders or demanders, and then they will not order more batches, which leads to large losses for enterprises;

Third, the charge for proofing can attract the attention of manufacturers, thus ensuring the delivery date and quality to a certain extent.

Distribution of PCB proofing manufacturers

PCB belongs to the electronics industry, and the electronics industry is concentrated in the Pearl River Delta region of Guangdong Province. Especially, Shenzhen has become a world-class electronic market. Therefore, PCB manufacturers are mainly distributed in Shenzhen, Dongguan, Zhongshan, Zhuhai and other coastal areas.

Baking board problem in SMT small batch chip processing plant

Before SMT small batch patch processing plant's patch processing, there is a process that is not particularly noticed, that is, baking plate. In the electronic processing plant, some circuit boards that do not meet the requirements of Xi'an SMT chip processing due to long storage time and humidity in the storage environment can be removed of excess water after a reasonable baking process, which is conducive to the processing quality and makes SMT chip components and pads better combined. PCB baking is generally necessary only when the boards have been washed. Otherwise, more baking tiMES will cause the boards to bubble. But generally, the original PCB will have a humidity card. First, confirm whether the humidity exceeds the standard. Sometimes even if there is a drying bag in it, it will be affected with moisture, so baking is necessary.

Xi'an SMT small batch patch processing plant

Precautions for baking boards before chip processing in small batch chip processing plants.

1、 Requirements: the temperature is 120 ± 5 ℃, generally baking for 2 hours, and the time starts when the temperature reaches the baking temperature. Specific parameters can refer to the corresponding PCB baking specifications.

2、 Temperature and time:

1. Bake at 120 ± 5 ℃ for 2 hours if the manufacturing date is 2 to 6 months.

2. Bake at 120 ± 5 ℃ for 4 hours when the manufacturing date is 6 months to 1 year.

3. If the seal is unsealed for more than 5 days within 2 months of manufacturing date, bake at 120 ± 5 ℃ for 1 hour.

4. The PCB that is one year later than the manufacturing date shall be baked for 4 hours at 120 ± 5 ℃ and re sprayed with tin before being put into production.

5. The circuit boards that have been baked must be processed within 5 days, and those that have not been processed need to be baked for another hour before they can be put online.

3、 Processing method:

1. components that will not be used after repair do not need to be baked.

2. Most small and medium-sized circuit boards are placed horizontally, which can be stacked with 40 pieces. The number of vertical circuit boards is unlimited. Take them out of the oven within 10 minutes after baking, and then place them horizontally at room temperature for natural cooling.

3. The medium and large circuit boards in SMT small batch SMT chip processing plants are mostly placed horizontally, which can be stacked for 30 pieces, taken out of the oven within 10 minutes after baking, and naturally cooled at room temperature.

點(diǎn)擊
然后
聯(lián)系
主站蜘蛛池模板: 天堂av无码av在线a√| 亚洲福利国产网曝| 国产欧美日韩一区二区搜索| 色噜噜狠狠色综合日日| 天干天干夜啦天干天干国产| 人妻丰满熟妇av无码区不卡| 人妻中文字幕在线网站| 亚洲综合电影小说图片区| 99久久国产综合精品成人影院| 人妻少妇无码中文幕久久| 一本无码中文字幕在线观 | 国产无遮挡无码视频免费软件| 亚洲人成网站在线播放动漫 | 国内女人喷潮完整视频 | 色综合久久中文字幕无码| 亚洲人成人一区二区三区| 99久久亚洲综合精品成人| 欧洲熟妇色xxxx欧美老妇免费| 88国产精品欧美一区二区三区| 99香蕉国产精品偷在线观看| 色窝窝无码一区二区三区| 日日摸夜夜添夜夜添高潮喷水| 国产精品美脚玉足脚交| 久久亚洲中文字幕无码| 精品国产人妻一区二区三区| 羞羞影院午夜男女爽爽在线观看| 国产日产欧美最新| 麻豆精品导航| 高潮喷水的毛片| 国产免费午夜a无码v视频| 久久久久久久久久久久中文字幕 | 本道av无码一区二| 日本亚洲欧美国产日韩ay| 天天av天天翘天天综合网| 制服丝袜另类专区制服| 无码一区二区三区av免费蜜桃| 色翁荡息又大又硬又粗又视频图片| 亚洲综合无码一区二区三区不卡 | 天天躁日日躁狠狠躁欧美老妇小说| 中国少妇xxxx做受| 精品无码久久久久久久久久|