午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
PCBA加工
PCBA加工
Performance test of common PCBA circuit boards
27Oct
Andy 0條評論

Performance test of common PCBA circuit boards

Performance test of common PCBA circuit boards

PCBA circuit board performance test is a necessary test to ensure the stability of product performance after PCBA processing. According to the actual use environment and purpose of the product, it is generally divided into withstand voltage test, insulation test, salt spray test, impedance test, vibration test, high temperature and humidity test, welding strength and thrust test, etc. Next, we will introduce the performance test of these PCBA circuit boards in detail.

PCBA circuit boards


1. Voltage withstand test

The purpose of withstand voltage test is to test the withstand voltage capability of the circuit board. The equipment needed is a "withstand voltage tester".

Test method: Connect the PCBA circuit board to be tested to the tester, increase the voltage to 500V DS (DC) at a speed not higher than 100V/S, and keep it for more than 30 seconds. If there is no fault in the circuit, the test is passed.

2. Leakage current test

The purpose of the leakage current test is to check whether the leakage current of the circuit board is within the requirements. The equipment needed is the "leakage current tester".

Test method: SIMulate the leakage current between the accessible part of the product and the two power supply poles under the normal working condition of PCBA circuit board and the normal temperature of the circuit board. If the current is less than the design standard, the test will be passed.

3. Salt spray test

The purpose of the salt spray test is to check the corrosion resistance of the circuit board. The equipment needed is the "salt water spray tester"

Test method: First of all, we need to prepare salt solution. The preparation method is: use chEMIcally pure sodium chloride and distilLED water or deionized water with a resistivity of no less than 5000 ohms * CM. Use 5% sodium chloride and 95% water to prepare a salt solution with a sodium chloride content of 5 ± 1% after full mixing. After the salt solution is prepared, spray continuously for 48 hours at a test site with a temperature of 35 ℃, and the average amount of spray per hour should reach 80CMm2/10CM. After 48 hours, if all functions of the product are normal, and the appearance and structure are normal, the test will be passed.

4. Impedance test

The purpose of impedance test is to check whether the circuit board circuit can operate normally. The equipment needed is an "ohmmeter"

Test method: Connect the transmission line of the circuit board to the battery. If we measure the impedance in a shorter time than the reflection of the transmission line, we can get the "surge" impedance or characteristic impedance. However, if the waiting time is long enough until the energy is reflected back and received, we can find that the impedance changes through measurement. Generally speaking, the impedance value will reach a stable limit value after bouncing up and down. If the limit value is within the specified range, Then the test is passed.

5. Vibration test

The purpose of vibration test is to detect whether the circuit board can pass random vibration tests of different levels. The equipment needed is a "vibration meter"

Test method: fix the circuit board or packaged circuit board on the test bench, set the frequency at 20Hz, axial direction: X, Y, Z, lasting for one hour in each direction for a total of three hours. After the test, if the circuit board functions normally, its appearance and structure are normal, and no abnormality such as loose welding or cracking of components is found, the test is passed.

6. High temperature and humidity test

The purpose of the high temperature and high humidity test is to check the applICability of the circuit board under the harsh conditions of high temperature and high humidity. The equipment needed is the "constant temperature and humidity test chamber".

Test method.

7. Welding strength thrust test

The purpose of welding strength thrust test is to test whether the welding strength of components meets the requirements. The equipment needed is a "thrust meter"

Test method: place the welded PCBA circuit board on the thrust meter. Components of different specifications have different passing requirements. Generally, we will eliminate other components at the edge of the target component, and then reset the instrument to zero. Carry out the thrust test at an angle ≤ 30 degrees to check whether the components are soldered, and record the value of component soldering.

The thrust standard of components with common specifications is 0.65Kgf for components with 0402 specifications, 1.20Kgf for components with 0603 specifications, 2.30Kgf for components with 0805 specifications, and 3.00Kgf for components with 1206 specifications.

The above are seven common PCBA circuit board performance test methods. You can choose different test methods according to your actual product situation.

點擊
然后
聯系
主站蜘蛛池模板: 日韩成人无码影院| 极品少妇伦理一区二区| 成人午夜又粗又硬又长 | 亚洲精品美女久久777777| 亚洲国产天堂一区二区三区| 国精产品999国精产| 亚洲欧美日韩在线观看一区二区三区| а天堂8中文最新版在线官网| 欧美色综合天天久久综合精品| 久久这里只精品国产免费9| 亚洲性人人天天夜夜摸18禁止| 久久久久无码精品国产app| 97人妻中文字幕总站| 精品国产精品三级精品av网址 | 精品久久久久中文字幕加勒比| 精品人妻久久久久久888| 久久午夜夜伦鲁鲁片免费无码影院 | 中国丰满熟妇xxxx性| 亚洲国产日韩制服在线观看| 777精品出轨人妻国产| 中文无码一区二区不卡av| 国产亚洲精品久久www| 无限看片在线版免费视频大全| 极品少妇被黑人白浆直流| 久久午夜无码免费| 亚洲综合成人av一区在线观看| 国产精品久久久久久av福利| 亚洲а∨天堂久久精品9966| 国产综合无码一区二区色蜜蜜| y111111少妇影院无码| 十八禁网站在线观看| 天天躁夜夜躁天干天干2020| 四虎影视国产精品永久在线| 欧美亚洲日本国产黑白配| 吃奶呻吟打开双腿做受视频| 黑人粗大猛烈进出高潮视频 | 无码乱肉视频免费大全合集| 国产成人无码av一区二区在线观看 | 2019亚洲午夜无码天堂| 无码中文字幕人妻在线一区| 亚洲欧美中文高清在线专区|