午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”PCBA訂購單需求。
PCBA加工
PCBA加工
How much do you know about the PCB assembly process?
09Oct
dengsijian 0條評論

How much do you know about the PCB assembly process?

As a PCB and PCB assembly manufacturer, it is necessary to let you know what our PCB assembly servICes are. PCB assembly is a complex and lengthy process involving many different stages and a key process in achieving the functionality of the final product. Every step has to be carried out very carefully. Any SMAll mistakes in the assembly process will lead to the failure of the final assembly. To help you learn more about the entire PCBA process, we explain each step in detail below.

before the assembly process

1. design for Manufacturability (DFM) Inspection

So what is DFM CHECK? Before the actual assembly process, the manufacturer thoroughly examines the PCB design files to check functionality and manufacturability. This phase, which we call DFM, examines the design specifications of the PCB and analyzes any missing, redundant, or potentially problematic features. This stage helps detect design errors and allows designers to remove all defects immediately for successful production.

DFM

2. Electronic component inspection

Kingford will do another step before assembly, component inspection, our team of engineers will check whether the component package, value, quantity, package, part number, etc. match the BOM and pcb board. We will work with the customer to resolve any errors before starting assembly.

Actual PCB Assembly Process Steps

1. Solder paste printing

Solder paste printers are designed to apply solder paste (a paste of small particles of solder mixed with flux) onto the appropriate pads on a circuit board using a stencil and a squeegee.

2. Component placement

This stage of the PCB assembly process is now fully automated. The pick and place of components such as surface mount components, once done manually, is now performed by robotic pick and place machines. These machines precisely place components into pre-planned areas of the board.

3. Reflow soldering

Once the solder paste and surface mount components are in place, they need to stay there. This means that the solder paste needs to cure, adhering the components to the board. To do this, the components using the solder paste and the components on it are passed through a conveyor belt that passes through an industrial-grade reflow oven. A heater in the oven melts the solder in the solder paste. Once this melting is complete, the assembly is again moved on a conveyor belt and exposed to a series of cooler heaters. The purpose of these coolers is to cool the molten solder and bring it to a solidified state.

Ten temperature zone nitrogen reflow welding

4. Inspection

After the reflow process, the PCB is inspected to check its functionality. This stage helps identify poor quality connections, misplaced components, and shorts due to the continuous movement of the board during reflow. PCB manufacturers employ multiple inspection steps, including visual inspection, automated optical inspection, and X-ray inspection, to check the functionality of circuit boards, identify poor-quality solder, and identify any potential hidden problems.

5. Through-hole component insertion

Certain types of PCBs require insertion of through-hole components as well as the usual SMD components. This stage is dedicated to this type of component insertion. For this purpose, plated-through holes are created with the help of PCB components that pass signals from one side of the board to the other. PCB through hole insertion is usually achieved by hand soldering or wave soldering.

Wave Soldering Manual Soldering

6. Final inspection and functional testing/IC programming

After the soldering step of the PCBA process is complete, a final inspection will test the functionality of the PCB. Such checks are calLED "functional tests". This test SIMulates normal operation of the PCB by testing the PCB. In this test, power and analog signals pass through the PCB while the tester monitors the electrical characteristics of the PCB.

7. Cleaning and Packaging

Since the soldering process leaves some flux residue in the PCB, it is critical to thoroughly clean the components before shipping the final board to the customer. For this, PCBs are washed in deionized water. After the cleaning process, use compressed air to dry the board thoroughly. The PCB assembly is now ready for customer inspection and inspection.


點擊
然后
聯(lián)系
主站蜘蛛池模板: 丰满护士巨好爽好大乳| av狠狠色丁香婷婷综合久久| 久久国产中文娱乐网| 国产欧美日韩一区二区三区在线| 图片区小说区激情区偷拍区 | 国产露脸150部国语对白| 日韩无套内射视频6| 国模欢欢炮交啪啪150| 粉嫩av国产一区二区三区| 中文无码一区二区不卡av| 曰本女人牲交全视频免费播放| 精品国产一区二区三区无码| 国产在线拍揄自揄视频菠萝| 制服丝袜美腿一区二区| 在线va亚洲va天堂中文字幕| 在线精品亚洲一区二区绿巨人| 国产性生交xxxxx无码| 夜鲁鲁鲁夜夜综合视频欧美| 亚洲色av天天天天天天| 人妻被修空调在夫面侵犯| 强开小嫩苞A片黑人| 精品成人免费国产片| 婷婷久久综合九色综合| 性高朝久久久久久久久久| 人妻换着玩又刺激又爽| 欧美老熟妇xb水多毛多| 国产女人好紧好爽| 无码精品久久久久久人妻中字 | 国产精品国产三级国产a| 亚洲色婷婷久久精品av蜜桃| 无码日韩精品一区二区人妻 | 亚洲国产精品18久久久久久| 国产精品导航一区二区| 日本丰满少妇xxxx| 久久综合色之久久综合| 黄a无码片内射无码视频| 永久免费的av在线电影网| 国产乱妇乱子在线视频| 2022国产在线无码精品| 久久精品第九区免费观看| 99精品丰满人妻无码一区二区|