午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
PCBA加工
PCBA加工
SMT solves printing problems and lead-free soldering
04Dec
Boy 0條評論

SMT solves printing problems and lead-free soldering

SMT solves printing problems and lead-free soldering
In the electronIC industry, SMT chip processing is mainly processed by SMT, and many failures will occur in the use process According to statistics, 60% of the defects are caused by solder paste printing Therefore, to ensure the high quality printing of SMT is an important prerequisite to ensure its processing quality The following describes how to solve printing errors during the repair process
5 * 1. There is no gap between the template and PCB printing method, that is, "touch printing". High stability requirements for various structures, suitable for printing high-precision solder paste. The metal plate is in good contact with the printed board and can be separated from the PCB after printing. This method has high printing accuracy, and is especially suitable for fine and super macro printing.
1. Printing speed.
The solder paste rolls forward when scraping. Suitable for screen printing and fast printing.
This rebound can also prevent solder paste leakage. In addition, the paste cannot be rolLED on the network, resulting in clear solder paste and too fast printing speed.
The dimension of is 10 * 20 mm/s.
2. Printing method:

PCBA

Contact or non-contact printing The printing method of screen printing and PCB blank is "non-contact printing", generally 0.5 * 1.0mm, which is applicable to solder pastes with different viscosities Push the solder paste into the steel MESh and press the PCB with a scraper After removing the scraper, the wire mesh is isolated from the PCB board, thus reducing the risk of vacuum leakage to the wire mesh
3. Scraper type:
The scraper is divided into plastic scraper and steel scraper. For integrated circuits with a distance less than 0.5mm, steel solder paste can be used to form solder paste after printing.
Scraper adjustment.
In the welding process, the scraper working point is printed along the 45 ° direction, which can significantly improve the non-uniformity of the opening and reduce the damage of the steel plate and the opening. The pressure of the scraper is usually 30N/mm.
SMT wafer processing
2. During installation, select IC installation height with spacing no more than 0.5mm, 0mm or 0~-0.1mm to avoid solder paste falling off due to low installation height and short circuit during reflow.
Remelt welding.
The main reasons for assembly failure caused by reflow welding are as follows:
First, the temperature rises too fast;
B. High temperature and overheating;
The heating speed of solder paste is faster than that of circuit board;
D. Excessive water.
This, when determining the remelting welding process parameters, all factors shall be fully considered to ensure that there is no problem in welding quality before large-scale assembly.
Introduction to SMT processing lead-free welding and maintenance
The introduction of lead-free chip assembly has always been the challenge of the first assembly, because it will face more challenges when processing and rework are needed. The maintenance of PCBA in lead-free environment will have higher cost, quality details, time and repeatability problems, but due to lead-free requirements, these problems need attention. Due to the need for lead-free processes:
1. Train lead-free assembly, maintenance and inspection operators and evaluate time and cost.
2. The prices of lead-free solders are higher than those of traditional solders, such as lead-free wires, rods and core solders.
3. The processing temperature of lead-free components (about 30-35 ° C) requires higher precision and precision.
4. Lead free technology also needs to study and plan SMT processing plants to establish correct PCBA repair process.
First of all, it is necessary to analyze the technical personnel according to the characteristics of lead-free process. To define rework standards, whether standard solder or lead-free solder is required, the process is the same, and the required steps are:
Define and execute an accurate thermal profile.
2. The faulty component must be removed.
3. Clean all rust or solder residues on site and prepare new parts.
4. Replace parts with new solder and flux and reflow.
5. Thoroughly check the rework.
In a lead-free environment, accurate and reliable rework is more difficult because PCBA and the parts closest to maintenance must undergo multiple high-temperature cycles. In order to protect the stability of the circuit board, the preheating temperature should be set within the range not higher than the glass transition temperature of the PCB data.
The subsequent steps involved in the rework process vary depending on the lead-free requirements The difference between standard and lead-free brings many challenges, which can only be solved by introducing new or changed technologies, including stricter and more accurate thermal curves, as well as in the whole PCBA maintenance process With this kind of pipe, many expensive problems caused by different heat distribution can be avoided
點擊
然后
聯系
主站蜘蛛池模板: 欧美老人巨大xxxx做受视频| 日本三级片网站| 欧美成人aaaa免费全部观看| 亚洲中文无码av永久伊人| 亚洲热无码av一区二区东京热av| 麻豆精品国产精华精华液好用吗| 韩国三级大全久久网站| 全黄h全肉边做边吃奶视频| 肉色超薄丝袜脚交一区二区| 国产亚洲精品a在线无码| 国产精品福利2020久久| 亚洲色欲色欲www在线播放| 亚洲日韩av无码中文字幕美国| 少妇粉嫩小泬喷水视频| 呻吟国产av久久一区二区| 国产精品免费麻豆入口| 亚洲自偷自拍另类12p| 护士奶头又白又大又好摸视频| 国内精品九九久久久精品| 亚洲欧洲日产国产 最新| 久久99av无色码人妻蜜柚| 国产欧美亚洲精品第一页| 精品亚洲成a人在线观看| 激情偷乱人伦小说视频在线| 亚洲欧美日本中文字不卡| 国产成人综合欧美精品久久| 大香伊人久久精品一区二区 | 天天做av天天爱天天爽| 高潮抽搐潮喷毛片在线播放| 国产成人无码av一区二区在线观看| 久久人人玩人妻潮喷内射人人| 国产成人无码18禁午夜福利免费| 亚洲精品精华液一区| 亚洲一区二区三区偷拍女厕| 国产精品永久免费视频| 国产精品_国产精品_k频道| 国产人妻鲁鲁一区二区| 国产免费爽爽视频| 国产suv精品一区二区6| 日韩一区二区三区高清电影| 亚洲中文字幕伊人久久无码|