午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
PCBA加工
PCBA加工
Assembly and placement process of PCBA electronic equipment
03Dec
Boy 0條評論

Assembly and placement process of PCBA electronic equipment

Assembly and placement process of PCBA electronic equipment
BasIC requirements PCBA electronic equipment assembly
The assembly and connection technology of PCBA electronic equipment is calLED electronic assembly technology for short. It is a combination of various technologies to assemble electronic parts and components into a complete machine according to design requirements. It is the main production link for manufacturing electronic complete machine products according to design requirements.
Assembly refers to the use of fasteners, adhesives, etc. to connect the electronIC parts of the product to the designated location as required, and assemble them into new parts until the final assembly of the product. The main connecting pipes include screw installation, riveting, bonding, crimping, winding and surface installation.
The basic requirements for installation are as follows:
l. The installed parts, components and the whole parts must be qualified and meet the process requirements. There shall be no scratches on the appearance and no damage to the coating.
2. During installation, the lead direction and polarity of electronIC components and mechanical mounting parts shall be correct and shall not be skewed, and the packaging shells of electronic components shall not contact each other.

PCBA

3. The electronic components installed mechanically shall be fixed before welding, and shall not be adjusted and installed after welding.
4. When installing various packages, do not open them unless there are special requirements.
5. Mechanical moving parts during installation must move smoothly and freely without blocking.
6. During installation, the foreign matters in the machine shall be cleaned to prevent short circuit fault.
7. The places where lubricant, fastener and adhesive shall be applied during installation shall be in place, uniform and appropriate.
8. When the insulated conductor passes through the metal frame hole, there shall be no tip burrs to prevent tip discharge.
9. When installing the ground wire weldment with fasteners, the paint layer and oxide layer at the installation position shall be removed to ensure good contact.
Four major installation processes of PCBA
With the development of PCBA module electronic products toward miniaturization and high assembly density, electronic assembly technology is also dominated by Surface Mount Technology Hower, there are still a certain number of through-hole components in some PCB circuit boards This assembly of both plug-in components and surface mount components is called hybrid assembly, or hybrid assembly for short. components using all surface mount components are called full surface mount
The PCBA assembly method and its process flow mainly depend on the type of assembly components and assembly conditions. It can be roughly divided into four types: single-sided installation technology, single-sided mixed installation technology, double-sided installation technology and double-sided mixed installation technology.
1. Single side installation process
Single side installation refers to the assembly where all components are installed on one side of PCB. The main process of single side installation process: printing solder paste - patch - reflow soldering - cleaning - inspection - rework.
2. One side mixing process
Single side hybrid assembly means that the components are not only installed components, but also plug-in components, and the components are assembled on one side of the PCB. The main process of single side mixed assembly process: printing solder paste patch reflow plug-in wave soldering cleaning test rework.
3. Double side installation process
Double sided installation refers to the components with all components installed on both sides of PCB. The main process flow of double-sided installation process: A-side printing solder paste - repair welding - reflow welding - solder piece - pin bending - turnover plate - B-side spot bonding - repair welding - curing - turnover plate - wave soldering - cleaning - inspection and rework.
4. Double-sided mixed packaging process
Double sided mixing refers to the assembly of components not only mounting components but also inserting components. The main process of double-sided mixed assembly process: A-side printing solder paste - patch - reflow soldering - parts - pin bending - flipping - B surface glue - repair - curing - flipping - wave soldering - cleaning - inspection and rework

The above is the explanation given by the editor of pcb circuit board company.
If you want to know more about PCBA, you can go to our company's home page to learn about it.
In addition, our company also sells various circuit boards,
High Frequency Circuit Board and SMT chip are waiting for your presence again.

點擊
然后
聯系
主站蜘蛛池模板: 在线黑人抽搐潮喷| 性一交一乱一伧国产女士spa| 尤物tv国产精品看片在线| 久久99热这里只频精品6| 亚洲精品四区麻豆文化传媒| 东北少妇不带套对白| 高潮爽死抽搐白浆gif视频| 性欧美欧美巨大69| 99在线精品视频观看免费| 人妻无码人妻有码中文字幕在线| 无码少妇一区二区三区芒果| 中文无码熟妇人妻av在线 | 午夜性刺激在线观看| 国产99re热这里只有精品| 国内精品视频一区二区三区| 亚洲精品久久久久久动漫器材一区| 免费无码高潮流白浆视频| 欧美日本日韩aⅴ在线视频| 日韩精品专区av无码| 人妻无码中文字幕一区二区三区| 国产麻豆剧果冻传媒一区| 精品少妇人妻av久久久| 欧美在线a| 制服国产欧美亚洲日韩| 亚洲欧美韩国综合色| 欧美人与动牲交zooz3d| 国产一女三男3p免费视频| 精品国产乱码久久久久久郑州公司| 亚洲中文字幕婷婷在线| 亚洲精品久久久久国产剧8| 午夜福利啪啪片| 欧美破苞系列二十三| 日韩a片无码一区二区五区电影| 在线看片国产日韩欧美亚洲| 国产精品你懂的在线播放| 青草精品国产福利在线视频| 欧美日韩无砖专区一中文字| 国产超碰人人做人人爽av大片| 老牛精品亚洲成av人片| 亚洲综合成人婷婷五月在线观看| 夜夜爽夜夜叫夜夜高潮|