午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”PCBA訂購單需求。
PCBA加工
PCBA加工
Specification for component insertion and mounting
12Nov
Cary 0條評論

Specification for component insertion and mounting

SpecifICation for component insertion and mounting

What should SMT chipprocessing plants pay attention to when producing SMT circuit board chip assembly? Let's take a look at the relevant precautions:

1. Before the SMT processing company inserts and pastes, each operator should do a good job of 5S at his own station and around. The main work is: if there are bulk materials or other bulk materials left by the machine type at this station, the material list and operation instructions, etc; The operator shall collect the materials and hand them over to the relevant materialman, foreman or production leader on duty. The materialman, foreman or production leader on duty shall classify, sort out and MARK the above items submitted and separate them from online materials.

2. When SMT processing patch row pulling, operators at each station shall conduct self inspection on the operation instructions and material conditions of the station. The specific work is:

1) Whether the operation instructions have been reviewed and officially issued by the document controller, and whether they are ambiguous.

pcb broad

2) Whether the material name/specification on the operation instruction book is consistent with the physical object, whether the point mark on the operation instruction book is consistent with the point to be mounted (inserted), and whether the SMT chip DIP material forming meets the point requirements and process standards. In case of any abnormality, it shall be reported in time, and the person in charge of production shall properly handle it together with the Quality Department, Material Department and Engineering Department.

3) All kinds of materials and operation instructions shall be placed in order according to the designated position and clearly marked. There shall be good isolation measures between all kinds of materials. Only after the first piece of DIP materials is inserted (pasted) and confirmed by IPQC or elongating, and the first piece is confirmed as OK by IPQC, can the operators conduct batch insertion (pasted) production.

4) When adding materials, the added materials must be checked by two people (usually the operator himself and the material clerk) before production.

5) If the operator finds any abnormality during SMT surface mounting production [such as the point to be inserted (pasted) is occupied by other materials, abnormal PCBA, turnover plate, cleaning plate, etc.], he/she shall immediately report it to the shift leader or production director. The leader or production director shall designate a special person to handle it and check the handling results, and then submit it to IPQC for key confirmation.

6) Horizontal components are generally required to be inserted by sticking plates and arranged neatly, with the width consistent with the span of the welding hole, and the error ≤± 0.5mm; The component body of the vertical component shall be vertical to the PCB and pasted. The height of the top bending parts of resistors, diodes, etc. shall be about 1.5-2 mm, and the bending parts shall be neat, continuous and smooth; Pay special attention to the correct direction of directional elements; Prevent flying feet and kneeling feet.

點擊
然后
聯(lián)系
主站蜘蛛池模板: 67194熟妇在线观看线路1 | 亚洲精品国产av成拍色拍个 | 男女啪啦啦超猛烈动态图| 国产福利第一视频在线播放| 性欧美牲交xxxxx视频欧美| 嫩草院一区二区乱码| 丰满饥渴老女人hd| 肉体暴力强伦轩在线播放| 国产成本人片无码免费2020 | 成年无码av片在线蜜芽| 五月狠狠亚洲小说专区| 人人摸人人搞人人透| 亚洲男人电影天堂无码| 无码中文字幕免费一区二区三区| 亚洲欧洲日韩国内高清| 97人妻免费碰视频碰免| 国产成人高清在线观看视频| 制服丝袜美腿一区二区| 欧美综合自拍亚洲综合图片区| 久久97超碰色中文字幕蜜芽| 欧洲免费一区二区三区视频| 少妇人妻无码精品视频app| 伊人干网综合亚洲| 日韩欧美群交p片內射中文| 97人摸人人澡人人人超碰| 亚洲无码不卡| 麻豆国产va免费精品高清在线| 人妻少妇av中文字幕乱码 | 免费无码av一区二区| 岛国在线观看无码不卡| 好想被狂躁无码视频在线字幕| 亚洲精品久久久久午夜aⅴ| 暖暖 在线 日本 免费 中文| 99久久er这里只有精品18| 国产欧美日韩国产高清| 国产热re99久久6国产精品首页 | 久久国产精品一国产精品金尊| 内射干少妇亚洲69xxx| 欧洲美熟女乱av亚洲一区| 国产真实迷奷在线播放| 亚洲s色大片在线观看|