午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
PCBA加工
PCBA加工
Cause Analysis and Prevention of PCBA Assembly Explosion -- Measures to Prevent Plate Explosion
01Nov
Andy 0條評論

Cause Analysis and Prevention of PCBA Assembly Explosion -- Measures to Prevent Plate Explosion

Cause Analysis and Prevention of PCBA Assembly Explosion -- Measures to Prevent Plate Explosion

PCBA processing is to connect various electronIC components on PCB board through surface mount (SMT), plug-in (DIP) and other electronIC assemblies. PCBA process flow mainly includes SMT, AOI, DIP, FCT testing and other processes. Due to the size difference of electronic components, there will be different processes and requirements in assembly and insertion. The assembly density of PCBA is relatively high, and the SMAll size and light weight of electronic products also have certain changes and requirements in mounting. The reliability, seismic resistance and excellent weldability of the products have high requirements for the hardware and software facilities of PCBA processing.


PCBA production


The key to solve the problem is to reduce the moisture absorption of printed boards during the manufacturing, storage and use of printed boards. To this end, there are the following measures:

1. PCB packaging and storage

After the PCB with high CTI value is made, the Circuit board manufacturer shall bake and dehumidify the PCB in the baking process, and then use two tiMES of high vacuum double-layer film packaging to increase the sealing of PCB packaging. Finally, desiccant shall be placed in the large package.

The packaged PCB storage shall be stored in a room temperature and low humidity environment, and placed on the platform or appropriate rack in the original packaging form. Avoid heavy pressure and deformation of plates caused by improper storage. The storage period is 3 months.

The PCBA assembly manufacturer shall check whether the packaging of such PCB incoming materials is intact, and confirm whether the shelf life and the status of the humidity card in the inner packaging meet the requirements. Prevent the use of overdue PCB.

2. PCBA board production

First, the drying process of PCB light plate shall be conducted for dehumidification before mounting, and then put into production to complete mounting - inserting - testing - packaging and shipping. The entire production process is required to be completed within one week in the production plan.

The temperature curve of reflow welding and wave soldering shall be set according to their operation instructions. The preheating rate cannot be too fast. Set the peak temperature to no more than 245 ℃. The higher the temperature is, the greater the risk of plate bursting is. For repair welding by manual welding, use a temperature controlLED soldering iron, set the temperature at 350 ℃, and control the welding time at 2~3s to prevent local overheating and potential defects.

For PCBA production with CTI>600, the key to prevent bursting is to do a good job of prevention and quality monitoring. Trace the production management of PCB with CTI>600. Production management of PCB with CTI>600. They are the foundation stone to prevent explosion.

In addition, the control of thermal stress in PCBA assembly and production can completely reduce or even eliminate the influence of thermal stress factors, which is the cause of bursting, and can completely reduce or even eliminate the occurrence of bursting.

點擊
然后
聯系
主站蜘蛛池模板: 国产成人亚洲综合网色欲网| av在线播放无码线| 国产亚洲一区二区手机在线观看| 国产做a爱片久久毛片a片高清| 亚洲国产成人av网站| 性色av无码专区一ⅴa亚洲| 欧美性色黄大片手机版| 国产亚洲精品美女久久久久| 日产乱码一区二区三区在线| 国产成人精品日本亚洲专区61| 污污污www精品国产网站| 国产精品久久久久蜜臀| 成人伊人亚洲人综合网| 人人妻人人插视频| 日本va在线视频播放| 国产又黄又硬又湿又黄的视| 无码午夜福利片| 好屌草这里只有精品| 少妇内射视频播放舔大片| 在线精品亚洲一区二区三区| 亚洲国产成人丁香五月激情| 好男人社区神马在线观看www| 最新国产麻豆aⅴ精品无码 | 亚洲中文字幕无码mv| 精品少妇人妻av一区二区三区| 亚洲欧洲日产国无高清码图片| 久久国产精品免费一区二区三区| 无码av免费精品一区二区三区| 好男人社区神马在线观看www| 美日韩在线视频一区二区三区| 亚洲欧洲国产码专区在线观看| 福利所第一导航福利| 亚洲一区二区三区香蕉| 色六月婷婷亚洲婷婷六月| 日韩亚洲欧美精品综合| 亚洲国产精品成人午夜在线观看| 国产一区二区野外| 人妻无码中文专区久久av| 中文字幕aⅴ人妻一区二区| 亚洲精品乱码久久久久久久久久久久 | 亚洲中文久久精品无码1|