午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”PCBA訂購單需求。
PCBA加工
PCBA加工
What are the steps for welding and testing the first PCB assembly board
29Oct
Andy 0條評(píng)論

What are the steps for welding and testing the first PCB assembly board

What are the steps for welding and testing the first PCB assembly board


The first piece refers to the first PCBA processing assembly plate meeting the requirements of patch processing and welding quality. The first finished board of the first batch of each new model is named as "first artICle" in SMT processing plant. Compared with subsequent products, the first article is not only an actual inspection of product performance, but also a quality inspection of engineering process.



PCB




The first piece refers to the first PCBA processing assembly plate meeting the requirements of patch processing and welding quality. The first finished board of the first batch of each new model is named as "first article" in SMT processing plant. Compared with subsequent products, the first article is not only an actual inspection of product performance, but also a quality inspection of engineering process. What are the welding and testing contents of the first PCB assembly board?

1. Welding of first PCBA assembly plate

Place the surface assembly plate that has passed the installation and inspection horizontally on the MESh conveyor belt or chain guide rail. The surface assembly plate slowly enters the furnace with the conveyor belt at the set speed, and then passes through the heating zone, insulation zone, reflux zone and cooling zone to complete reflow welding. Connect the surface assembly plate at the outlet in time. Wear an anti-static wrist strap during operation.

What are the steps for welding and testing the first PCB assembly board

2. Inspect the welding quality of the first PCB assembly plate

(1) Inspection method of pcb board

The welding quality of the first pcb assembly board is generally inspected by visual inspection, and 2~5 times magnifying glass or 3~20 times microscope are selected for inspection according to the assembly density

(2) Inspection content

① Inspect whether the welding is sufficient and whether there are traces of insufficient melting of solder paste. ② Inspect whether the surface of the welding spot is smooth, whether there is hole defect, and the size of the hole. ③ Inspect whether the amount of solder is appropriate and whether the shape of solder joint is half moon. ④ Check the number of solder balls and residues. ⑤ Check the defect rate of the monument, faulty welding, bridging, element displacement, etc. ⑥ Also check the color change of PCB surface, and allow PCB to have a little but uniform color change after reflow soldering.

(3) Inspection standard

According to the enterprise standards formulated by the unit or other standards. At present, IPC-A-610E is mostly adopted for implementation.

3. Adjust the parameters according to the welding quality inspection results of the first pcb assembly plate

① The parameters shall be adjusted item by item to facilitate analysis and summary.

② First, adjust (fine tune) the speed of the conveyor belt, retest the temperature curve, and conduct test welding.

③ If the welding quality cannot meet the requirements, adjust the temperature of each temperature zone until the welding quality meets the requirements.

點(diǎn)擊
然后
聯(lián)系
主站蜘蛛池模板: 精品无码av一区二区三区不卡| 性一交一乱一伧国产女士spa| 欧美精品色婷婷五月综合| 欧美乱妇狂野欧美在线视频| 亚洲国产成人手机在线观看| 伊人久久大香线蕉av五月天| 日韩乱码人妻无码中文字幕视频 | 大地资源网中文第五页| 亚洲和欧洲一码二码区别7777| а√天堂中文在线资源库免费观看| 亚洲国产成人av在线电影播放 | 亚洲热妇无码av在线播放| 一本色综合亚洲精品蜜桃冫| 午夜精品成人一区二区视频| 亚洲中文精品久久久久久| 国产午夜理论不卡在线观看| 日韩高清国产一区在线| 久久精品成人无码观看| 国产爱豆剧传媒在线观看| 欧美亚洲一区二区三区| 国产精品亚洲一区二区三区喷水| 中日产幕无线码一区| 国产无av码在线观看| 亚洲综合色在线观看一区二区| 久久99青青精品免费观看| 色噜噜久久综合伊人一本| 无码国产色欲xxxxx视频| 国产丰满麻豆videossexhd| 亚洲综合国产成人无码| 精品视频一区二区三三区四区| 插插插精品亚洲一区| 四虎成人精品一区二区免费网站| 国产免费久久久久久无码| 少妇高潮潮喷到猛进猛出小说 | 国产a精彩视频精品视频下载 | 久久成人a毛片免费观看网站 | 久久久婷婷成人综合激情| 亚洲国产成人爱av网站| 国产精品视频免费一区二区| …日韩人妻无码精品一专区| 国产超碰人人做人人爱ⅴa|