午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿(mǎn)足“快速服務(wù),零缺陷,輔助研發(fā)”P(pán)CBA訂購(gòu)單需求。
電話(huà):13410863085
PCBA加工
PCBA加工
PCBA cleaning free process management
28Oct
Andy 0條評(píng)論

PCBA cleaning free process management

PCBA cleaning free process management



Cleaning free after PCBA processing is a systematIC project. From PCB design to SMT production process, strict requirements must be met to avoid man-made pollution during production and manufacturing. Effective measures shall be taken in the design of cleaning free process and process management control. 1、 Source analysis of pollutants in the manufacturing process 1. Pollutants brought by components and printed boards before assembly.

Cleaning free after PCBA processing is a systematic project. From PCB design to smt production process, strict requirements must be met to avoid man-made pollution during production and manufacturing. Effective measures shall be taken in the design of cleaning free process and process management control.


PCBA


1、 Source analysis of pollutants during manufacturing

1. Contamination from components and printed boards before assembly. There are also pollutants carried with rice during inspection, packaging and transportation.

2. Pollution Environmental temperature, humidity, and environmental atmOSPhere will make components and printed boards damp and oxidized: air and dust on the workbench and tool surfaces will cause pollution.

Quality requirements and control measures for PCBA cleaning free process management

2、 Control measures for cleaning free process management

The cleaning free process must ensure that the PCB and components meet the required cleaning standards before assembly, ensure that the flux and solder paste meet the cleaning free quality requirements, avoid pollution in each process of the manufacturing process, and use nitrogen protection welding when necessary.

1. When purchasing qualified components, do not open the seaLED packaging of components and PCBs in advance. Before assembly, check the cleanliness of PCBs and components, and check whether they are damp. If necessary, wash and dry them.

2. During the management and transmission of components, circuit boards and other raw materials, when printing solder paste and SMT patch are operated, it is required to hold the edge of PCB or wear gloves. Direct hand contact should be avoided to prevent hand sweat, fingerprints, etc. from polluting PCB.

3. In wave soldering process, for electronic products with high reliability requirements, low solid content and weak organic acid type flux shall be used, and ammonia gas shall be used for protection during welding. The spray coating method is used for the flux. On the prEMIse of ensuring the welding quality, the coating amount of the flux shall be reduced as far as possible to minimize the residual amount of the flux after welding.

4. For PCBA circuit boards in general electronic products, medium active low residual rosin flux (RMA) can be selected. This type of flux generally does not require nitrogen protection. The application of flux shall be of spray type and ultrasonic spray type as far as possible to control the flux dosage.

5. Regularly check the composition and impurity content of solder alloy in wave soldering tin pot (lead welding shall not exceed 6 months, and lead-free welding shall be tested once a month). If it does not meet the requirements, it must be replaced.

6. The opening of the cleaning free solder paste printing template shall be reduced by 5% 6~106 to improve the printing accuracy and avoid solder sound printing to places outside the pad.

7. Generally, the recycled solder paste cannot be used in the cleaning free process.

8. Reflow soldering shall be completed within 4h after printing.

9. The real-time temperature curve must be measured before production to make it meet the process requirements. Carefully adjust the temperature curve of the wave soldering machine/reflow soldering furnace, so that the activity of the flux reaches the highest level before the melting of the solder alloy and during the bonding, and improve the welding quality. Manual repair welding and repair should use cleaning free welding wires and

No cleaning flux.

10. After manual repair welding and repair, the unheated flux flowing out of the solder joint shall be wiped off immediately, because unheated flux is corrosive.

點(diǎn)擊
然后
聯(lián)系
主站蜘蛛池模板: 狠狠躁天天躁无码中文字幕图 | 亚洲精品乱码一区二区三区| 国产美熟女乱又伦av果冻传媒| 欧美精品久久久久久| 伊人久久精品一区二区三区| 野花社区免费观看在线www| 亚洲色无码专区在线播放| 无码精品人妻一区二区三区湄公河| 国产传媒麻豆剧精品av| 久久婷婷是五月综合色| 国产精品久久久久久不卡盗摄| 国产精品国产三级在线...| 亚洲无日韩码精品| 97精品国产一区二区三区| 天堂а√8在线最新版在线| 亚洲在线观看| 国产人妖乱国产精品人妖| 天天做天天爱夜夜夜爽毛片| 国产亚洲精品自在久久| 久久精品国产只有精品66| 亚洲国产剧情中文视频在线| 成人午夜精品无码区| 中文字幕精品亚洲字幕资源网| 精品久久久久久无码中文字幕一区 | 国产三级a三级三级| 久久国产免费福利永久| 曰本大码熟中文字幕| 国产精品国产自线拍免费不卡| 亚洲成在人线在线播放无码vr| 五月丁香六月综合缴清无码| 天天躁日日躁狠狠躁av麻豆男男| 日本一卡二卡四卡无卡乱码视频免费 | 国内精品久久久久久影院| 天堂亚洲国产中文在线| 国产制服丝袜亚洲日本在线| 国产色诱视频在线观看| 精品人妻无码一区二区三区换脸| 久久亚洲日韩看片无码| 美女裸体自慰在线观看| 国产性夜夜春夜夜爽1a片| 九色精品国产成人综合网站|