午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”PCBA訂購(gòu)單需求。
行業(yè)新聞
行業(yè)新聞
Prevention and treatment of reflow soldering of smt
02Dec
Boy 0條評(píng)論

Prevention and treatment of reflow soldering of smt

Prevention and treatment of reflow soldering of SMT
Reflow soldering is the key process of SMT placement in the welding process You may encounter various unexpected situations during your work If proper handling methods and necessary measures are not taken, serious safety and quality accidents may occur
1. Precautions
1. The reflow furnace must fully reach the set temperature (green light on) before welding.
2. During welding, the temperature change of each temperature zone is often observed, with the variation range of ± 1 ℃ (according to the reflow furnace).
3. When the SMT chip processing equipment is abnormal, it should be shut down immediately.
4. The size of the base plate shall not be greater than the width of the conveyor belt, otherwise board card accidents may easily occur.
5. Before welding, SMT processing plant shall take protective measures (mask) or avoid reflow welding for parts that cannot withstand normal welding temperature according to the provisions of process files or component packaging instructions. After welding with manual welding or welding robot.
Circuit board


PCBA


6. During SMT repair welding, strICtly prevent the conveyor belt from vibration, otherwise it will lead to component displacement and welding spot interference
7. Regularly measure the exhaust volume of the air outlet of the reflow soldering furnace. The air displacement directly affects the welding temperature.
2. Emergency treatment
1. Card board
1. If the plate is stuck, do not feed the plate into the furnace.
2. Open the furnace cover and take out the steel plate.
3. Find out the cause and take measures.
4. When the temperature reaches the required temperature, continue welding.
2. Alarm
If an alarm occurs, stop welding, check the cause of the alarm and deal with it in time
3. Sudden power failure
1. In case of power failure, do not send the plate into the furnace again. The conveyor belt or track will continue to run due to the support of various power supplies behind the UPS. After the surface mount plate runs to the furnace mouth and all the surface mount plates are connected, open the furnace cover and cool down, and then stop the machine.
2. Under unexpected circumstances, if the UPS fails, use a spanner wrench to clamp the square shaft rotating motor at the motor outlet, and take the PCB out of the furnace as soon as possible.
Why should SMT factory pay attention to the site
(1) "Three principles" of "site, existing and reality"
The continuous improvement of the site is considered to be the secret of the success of the Japanese company. The "three site principles" of "site, site and reality" reflect the importance of site and the concept of continuous improvement, and are widely used in Japanese enterprises. "Site" is the place where products are produced and services are provided; "Real things" are the main body of the website, which may be machine failures, unqualified products, damaged tools or customer complaints; "Reality" is to analyze real things on the spot and solve problems.
The "Three Presence Principles" emphasize that managers should go to the site to analyze and solve the problems of existing objects. When a problem occurs, the place to solve the problem should be the site, not the office or meeting room. On site, managers can usually find problems and take countermeasures in a timely manner by checking objects, observing, touching, feeling, and combining their own experience.
Give play to the role of the "three presence principle" and develop into the "five presence technology": on-site, physical, real, cash and current identification. The addition of "cash" and "cash confirmation" on the basis of the "three present principle" means that the results of on-site improvement will be converted into the amount to be confirmed, emphasizing the quantification of improvement results and cost awareness. The essence of the "Three Presence Principles" is to attach importance to the scene. As factory managers, we have learned that to solve on-site problems, we must go to the site.
(2) Laws for solving on-site problems
When solving on-site problems, the following steps should be followed, which is calLED the law of solving on-site problems here:
The first step is to go to the scene when problems occur;
The second step is to check the truth;
The third step is to take temporary measures on site;
The fourth step is to analyze the causes and find permanent countermeasures;
The fifth step is to regulate and prevent recurrence.

The above is the explanation given by the editor of pcb circuit board company.
If you want to know more about PCBA, you can go to our company's home page to learn about it.
In addition, our company also sells various circuit boards,
High Frequency Circuit Board and SMT chip are waiting for your presence again.

點(diǎn)擊
然后
聯(lián)系
主站蜘蛛池模板: 亚洲综合欧美制服丝袜| 制服丝袜av无码专区完整版| 久久免费的精品国产v∧| 国内一区二区三区香蕉aⅴ| 自偷自拍亚洲综合精品| 少妇无码吹潮| 久久综合少妇11p| 九九精品无码专区免费| 国产又色又爽又黄的| 国产免费午夜福利蜜芽无码| 亚洲中文字幕精品一区二区三区 | 成人精品一区二区三区电影| 久久爱www人成狠狠爱综合网| 亚洲 自拍 欧美 日韩 丝袜| 18黄暴禁片在线观看| 成年无码一区视频| 国产av亚洲精品久久久久久小说| 麻豆精品久久久久久中文字幕无码| 国产一区二区三区精品av| 日本大胆欧美人术艺术| 国产精品亚洲日韩欧美色窝窝色欲| 亚洲国产精品无码久久久动漫| 久久老子午夜精品无码怎么打| 手机看片久久国产免费| 99国产精品久久久久久久日本竹| 韩国无码色视频在线观看| 日韩精品射精管理在线观看| 亚洲欧美高清在线精品一区二区 | 99re8精品视频热线观看| 94久久国产乱子伦精品免费| 丰满人妻熟妇乱又伦精品视频三 | 亚洲精品亚洲人成在线| 亚洲欧洲日产国产av无码| 亚洲人成无码网站久久99热国产| 人妻被修空调在夫面侵犯 | 日本丰满少妇高潮呻吟| 日韩av高清无码| 狂野欧美激情性xxxx按摩| 在教室伦流澡到高潮hnp视频| 国内精品一区二区三区| 日韩亚洲欧美久久久www综合|