午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”P(pán)CBA訂購(gòu)單需求。
行業(yè)新聞
行業(yè)新聞
Classification of red patch adhesives and mounters
01Dec
Boy 0條評(píng)論

Classification of red patch adhesives and mounters

ClassifICation of red patch adhesives and mounters
What is the difference between red rubber wire MESh and solder paste wire mesh? Is the process different? Price not used? Still different? In fact, the difference between the two is When opening the wire mesh, open the solder paste mesh in the original pad, and then open the red plastic mesh in the center of the two pads. The hole can be extended to double points and bone shape
1. The thickness and opening of the template shall be made of red surface mounted patch plastic.
(1) The thickness of red rubber mesh is usually 0.18mm, 0.2mm, 0.25mm, etc.
(2) The opening requirements of the red plastic template: the opening width of the IC is 1/2 of the width of the two pads, and multiple SMAll round holes can be opened.
2. Red plastic equipment patch design requirements:
(1) The long axis of the chip assembly must be perpendicular to the transmission direction of the wave soldering machine; The long axis of the IC equipment must be parallel to the conveying direction of the wave soldering machine.
Circuit board

PCBA(2) In order to avoid the shadow effect, the ends of components with the same size are arranged in parallel with the direction of the welding wave; Parts of different sizes must be staggered; Small parts shall be arranged in front of large parts; The body can protect the welding head and welding nail. When it is not possible to arrange according to the above requirements, there must be a gap of 3 to 5 mm between the components.
(3) The feature directions of components must be consistent. For example, the polarity of the electrolytic capacitor, the anode of the diode and the single pin end of the transistor should be perpendicular to the transmission direction, the first stage of the integrated circuit, etc.
3. Red plastic opening and pad design surface mount patch assembly:
(1) Assembly holes must be arranged in the basic grid, 1/2 basic grid and 1/4 basic grid. The clearance between the plug hole and the pin diameter of the inserted part facilitates wetting the solder.
(2) For wiring of high-density components, oval grounding mode shall be used to reduce tin connection.
Basic requirements for components and printed circuit boards in wave soldering process.
(1) Three layers of surface mounted components shall be selected. The main body of the component and the welding point can withstand the temperature impact of more than twice welding every 260 ℃ wave. After welding, the main body of the device is not damaged or deformed, and the end of the chip assembly is not coated.
(2) The surface mount substrate must be able to withstand heat resistance of 260 ° C/50 seconds. Copper foil has good peel strength, and the welding resistant layer still has sufficient adhesion at high temperature, and the welding resistant layer will not wrinkle after welding.
Classification and maintenance knowLEDge of surface mount mounters
Classification of SMT tape: steel wire T-shaped track, main belt, motor belt, X-axis belt, Y-axis belt, RN axis synchronous belt: input plate drive belt, CP33L conveyor belt, CP40L conveyor belt, CP45FV/NEO conveyor belt, R-axis belt, SM321 conveyor belt, toothed belt, Z-axis belt, JUKI2050 T-axis belt, wide belt, conveyor belt.
Specification of surface mounted patch tape: (thickness: 0.6mm 0.8mm 0.9mm 1.0mm 1.1mm 1.2mm 1.3mm 1.5mm 2.0mm)
How to fix the SMT tape:
1. Turn off the power, remove the protective cover, loosen the mounting bolts on the motor base, and move the motor forward and backward.
2. Shake the motor to make the belt loose enough for disassembly. Do not use tools to slide the surface mounting tape.
3. Remove the old belt and check for abnormal wear. Excessive wear may indicate a problem with the transmission design or maintenance.
4. Clean the surface mount patch belt and pulley: Clean the cloth with a small amount of non-volatile liquid. Do not soak in detergent or rub the belt with detergent. Do not scratch the belt with sandpaper or sharp objects. The belt must be dry before installation.
5. The SIMplest way to check whether the belt is broken or worn is to use a pulley groove gauge. If excessive wear occurs, replace the pulley.
6. Check the symmetry, durability and lubrication of the remaining drive components, such as bearings and bushings.
Surface mount patch has a high demand on the conveyor belt, especially the anti-static requirement In the manufacturing process of electronic products, electrostatic discharge can change the characteristics of semiconductor devices, causing damage or unstable performance, resulting in damage to the final product or improper use

The above is the explanation given by the editor of PCB circuit board company.
If you want to know more about PCBA, you can go to our company's home page to learn about it.
In addition, our company also sells various circuit boards,
High Frequency Circuit Board and SMT chip are waiting for your presence again.

點(diǎn)擊
然后
聯(lián)系
主站蜘蛛池模板: 老湿机香蕉久久久久久| 少妇厨房愉情理伦片bd在线观看| 日本一区二区三区免费视频| 国产亚洲精品综合一区| 亚洲第一区无码专区| 暖暖 在线 日本 免费 中文 | 亚洲精品国产suv一区| 吃奶呻吟打开双腿做受动态图| 亚洲欧洲av综合一区二区三区 | 人妻无码手机在线中文| 四虎国产精品永久地址49| 中文字幕一区日韩精品| 国产欧美久久一区二区| 狠狠cao日日橹夜夜十橹| 成人久久免费网站| 国产女人高潮叫床视频| 2021最新久久久视精品爱| 国产精品午夜无码体验区| 国产未成女一区二区| 狠狠色丁香婷婷久久综合| 日韩亚洲中字无码一区二区三区| 国产互换人妻hd| 亚洲精品一区二区久| 亚洲国产av玩弄放荡人妇| 男人一边吃奶一边做爰免费视频| 亚洲欧洲精品a片久久99| 久久久亚洲欧洲日产av| 丰满巨乳淫巨大爆乳| 精品国产成人一区二区 | 亚洲αⅴ无码乱码在线观看性色 | 亚洲va中文在线播放| 人人爽久久涩噜噜噜av| 国产精品国产三级国快看| 色综合久久综合欧美综合网| а√中文在线资源库| 亲胸揉屁股膜下刺激视频免费网站| 亚洲欧美日韩精品成人| 九九精品无码专区免费| 欧美老熟妇欲乱高清视频| 欧美成人片在线观看| 国内久久婷婷五月综合色|