午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”PCBA訂購單需求。
行業(yè)新聞
行業(yè)新聞
Test the effectiveness and operation steps of SMT
01Dec
Boy 0條評論

Test the effectiveness and operation steps of SMT

Test the effectiveness and operation steps of SMT
Test performance index mounting machine
Many people want to take risks or develop into the industry of full-automatIC SMTequipment. We can use the original placement machine for automatic placement, fast and accurate placement. But when we purchase the placement machine, you must test the it performance indicators. We will certainly not buy low-quality, high price machines, so we must know how to detect? Let's introduce our factory:
1. Assembly failure rate: no matter what kind of machine, assembly failure will occur, which is inevitable.
2. The air compression mounter and dry filter system are complete, which fully proves that the machine infrastructure is relatively in place.
3. If we buy the transmission belt of the machine and the chain is worn or aged, it may be a second-hand machine and must be checked.
4. The mounter system can be started and closed normally to ensure the normal operation of its input, output and other system functions.
Circuit board


PCBA


5. The guide rail and the lead screw run smoothly and harmoniously without noise and oil leakage.
6. The appearance of various indicators, buttons and operating handles is complete, and the operation display is normal.
7. The variety, specification, placement direction, base material size and original placement range can be placed according to the specifications and standards.
8. Drive cylinder, solenoid valve, pipeline and gasket shall be free of foreign matter blockage and air leakage. The drive cylinder and solenoid valve work normally without noise.
9. SMT placement speed: Generally, if the IPC is not less than 60% of the rated speed, the IPC is at the normal speed, or the speed we control is not more than 2 tiMES, then we use 1608 components for system testing and assembly at the rated speed. sure
Basic operation steps of the chip mounter
If you want to rapidly produce and assemble components on PCB, we must understand and use SMT mounter. It is not only convenient, fast, accurate and convenient for production, but also discusses the production and operation steps of SMT mounter.
1. Apply solder paste on the PCB to be assembLED, or use the solder paste printer for automatic printing, and then send the PCB coated with solder paste to the SMT mounter for reasonable fixation
2. We install the data in the designated position of the feeder according to the system program settings, so that the mounting head of the mounter can quickly absorb the components.
3. In the system, the control mounting head moves to the position where we want to pick up the parts. At this time, open the vacuum environment in the nozzle to enable the nozzle to absorb and connect components normally.
4. According to the components we want to produce, identify the components and match them in the SMT mounter system. If the component does not meet the standard, we must throw the component into the trash can.
5. According to the settings in the program, adjust the rotation angle of the assembly through the Z axis of the label head, and move the sticker head to the position set by the program, so that the center of the assembly matches the sticker position of the sticker.
6. The nozzle of the SMT mounter will drop to the height set by the program. Turn off the vacuum, and the assembly will drop to complete the assembly mounting operation.
7. After using SMT mounter to assemble components, we need to reset the nozzle position. We will transfer the installed PCB board to the set position interface
Multi functional machines often contact our SMT machine team in the SMT chip industry. If we don't know that the SMT mounter will not work correctly, let me compensate you and introduce the following four important steps: our machine.
1. Patch transportation: the transportation function is an important function of the entire patch automated production workshop. It is mainly responsible for the reasonable transportation of PCB boards through the upper and lower board machines, and can cooperate with SMT mounters to achieve high-speed production functions.
2. SMT pickup: SMT pickup plays a central role in the function of SMT mounter. During the operation of the SMT mounter, the system provides the system with location information and project information to provide the machine with the human head being emptied and pasted to the target position to achieve paper production. In general, learning SMT patches requires the shortest time, and the higher the accuracy is, the key to performance testing.
3. Calibration check: check the errors in the production process for our arrangement and classification After the placement machine is completed, you can select AOI inspection equipment to test and perform PCB assembly test and inspection. When a failure occurs, timely adjustment and solutions enable us to save costs and reduce waste
4. Arrangement and adjustment: After completing all assembly inspection tasks, we can also conduct a second inspection. Under normal conditions, check whether the center of the component matches the center of the SMT mounter installation location, and ensure that the component meets the current installation requirements.

點擊
然后
聯(lián)系
主站蜘蛛池模板: 成人午夜亚洲精品无码区毛片| 男男gv白嫩小受gv在线播放| 国产青草视频在线观看| 国产日韩制服丝袜第一页| 久久99精品久久水蜜桃| 黄色视频免费| 欧美人与动牲交zooz3d| 国产精品理论片在线观看| 国产成人a∨麻豆精品| 国产精品无码一区二区在线a片 | 装睡被陌生人摸出水好爽| 亚洲国产另类久久久精品网站| 国内精品久久久久久影院8f| 人人摸人人搞人人透| 色无码av在线播放| 亚洲国产码专区| 性一交一乱一伧国产女士spa| 国产精品极品在线视频| 少妇无码av无码去区钱| 狼人大香伊蕉国产www亚洲 | 国产动作大片中文字幕 | 正在播放熟妇群老熟妇456| 亚洲人成人网站色www| 狠狠躁夜夜躁人人爽天天开心婷婷 | 亚洲中文字幕琪琪在线| 精品午夜国产福利在线观看| 人妻丰满熟妇aⅴ无码区| 97人人添人澡人人爽超碰| 精品国内在视频线2019| 国产亚洲精品久久7788| 久久婷婷五月综合色d啪| 亚洲伊人久久大香线蕉| 国产开嫩苞实拍在线播放视频| 1000部啪啪未满十八勿入| 欧美日韩国产一区二区三区不卡| 欧美性猛交99久久久久99按摩 | 国产女女做受ⅹxx高潮| 久久无码中文字幕久久无码app| 嫩草av久久伊人妇女超级a| 日本一卡二卡四卡无卡乱码视频免费| 极品新婚夜少妇真紧|