午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”PCBA訂購(gòu)單需求。
行業(yè)新聞
行業(yè)新聞
Reasons for poor welding in PCBA manufacturing
01Dec
Boy 0條評(píng)論

Reasons for poor welding in PCBA manufacturing

Reasons for poor welding in PCBA manufacturing
What tools are needed for PCBA manufacturing?
The basIC tools required for welding PCBA manufacturing components are SMAll tweezers, iron, tin tape, hot air gun, anti-static bracelet, rosin, alcohol solution, and magnifying glass with desk lamp.
Small tweezers: use small non embroidery steel and pointed tweezers instead of other small tweezers that may have magnetism, because during the bonding process of the patch, the magnetic tweezers will make the components adhere to the tweezers.
Soldering iron: SMT process operator will select a tapered long life soldering iron head with a radius less than 1mm. Two sets of soldering irons are prepared for use when disassembling components.

PCBA

Hot air gun: The operator of PCBA manufacturer can use a soldering iron to solve the problem when disassembling two or three terminal assemblies, but must use a hot air gun when disassembling the multi lead assembly. The hot-air gun can improve the reusability of disassembLED parts and avoid damaging the pad. In order to carry out frequent component disassembly, it is necessary to select a hot air gun with good performance.
Tin tape: When short circuit occurs in IC lead welding, it is a good choice to use tin tape. The tin strip cannot be used at this time.
Magnifier: SMT technicians should choose a magnifier with a lamp holder instead of a palm magnifier, because welding requires one hand to operate under the magnifier. Lighting the lamp can make the vision clear and increase the visibility of welding.
Polychlorinated biphenyls
PCBA manufacturer analyzes the causes and steps of poor welding PCBA manufacturing
1. PCBA process operator shall first check whether there is rust, oil stain and other impurities in the weld, or whether there is bulge and poor contact, which will increase the contact resistance, reduce the current and lead to insufficient weld temperature.
2. The staff of PCBA board and patch processing plant will check whether the current setting meets the process requirements. If the current setting is not increased when the product thickness changes, insufficient current in welding will lead to poor welding.
3. The SMT welder of the PCBA plate manufacturer will check whether the overlap of the weld is normal and whether the overlap of the drive side is reduced or cracked. The reduction of the overlap will make the bonding area of the front and rear steel strips too small, reduce the total stress surface, and cannot withstand greater tension. In particular, the cracking on the drive side will cause stress concentration, and the cracking will become larger and larger, and then pull out.
4. The operator of PCBA processing plant will check whether the pressure of welding wheel is reasonable. If the pressure is insufficient, although the welding controller has a constant current control mode, the actual current will be reduced due to excessive contact resistance. However, if the resistance increases beyond a certain range (usually 15%), it will exceed the limit of current compensation, and the current cannot increase with the increase of resistance, reaching the set value. In this case, the system will give an alarm when it is working normally.

點(diǎn)擊
然后
聯(lián)系
主站蜘蛛池模板: 欧美黑人性暴力猛交喷水黑人巨大| 午夜精品久久久内射近拍高清| 国产又爽又黄无码无遮挡在线观看| 久久国产精品日本波多野结衣| 亚洲色拍拍噜噜噜最新网站| 日本熟妇色xxxxx日本免费看 | 裸体美女网站| 国产精品无码永久免费888 | 137裸交肉体摄影| 插我舔内射18免费视频| 久久av老司机精品网站导航| 99热热久久这里只有精品68| 精品无码国产自产在线观看水浒传| 精品三级久久久久电影网| 国产毛片精品av一区二区| 欧美69久成人做爰视频| 中文字幕无线码免费人妻| 乱人伦中文字幕在线| 国产三级在线观看免费| 欧洲黑大粗无码免费| 国产韩国精品一区二区三区| 亚洲午夜久久久久妓女影院| 国产狂喷潮在线观看中文| 亚洲国内精品自在线影院牛牛| 欧美日韩国产专区一区二区| 久久精品麻豆日日躁夜夜躁妓女| 草草影院发布页| 久久国产精品人妻一区二区| 天天狠天天添日日拍| 韩国19禁主播深夜福利视频| 乱人伦无码中文视频在线| 国产午夜无码片在线观看| 国产色视频网免费| 性欧美视频videos6一9| 亚洲精品国偷自产在线| 97国产精华最好的产品| 成人免费一区二区三区视频| 伊伊综合在线视频无码| 蜜桃av亚洲精品一区二区| 国模冰莲自慰肥美胞极品人体图| 国产精品久久久久9999小说|